Quality / APQP & PPAP

APQP & PPAP

Structured quality planning and documented validation from project review through production approval.

Start an RFQ
Die and aluminium casting detail in RIVIMETAL production
Quality planning before production

A controlled route to production approval.

Project requirements are translated into structured planning, process-risk review, validation and documented approval before serial production.

01Project Requirements
02APQP
03PFMEA
04Process Flow
05Control Plan
06Validation
07PPAP / Approval
08Serial Production
APQP

Planning the production route.

RIVIMETAL follows APQP methodology from feasibility through process preparation and final approval, with process risks and applicable customer requirements considered from the start.

01PFMEA

Supports early identification of potential process failures and preventive safeguards.

02Process Flowcharts

Define manufacturing and inspection steps with clear control points for the project.

03Control Plans

Document the controls and reaction strategy required for the production process.

04Customer Requirements

Applicable customer-specific requirements are incorporated into planning and validation.

RIVIMETAL high-pressure die casting production line
Process preparationPlanning connected to the real production route.
RIVIMETAL aluminium castings within the production route
PPAP

Documented production approval.

Following process preparation, documented validation supports the transition toward production approval and serial manufacture.

01Validation

The defined production route is reviewed and supported by documented quality evidence.

02FAI

First Article Inspection is conducted at tool release with dimensional reporting.

03PPAP / Approval

PPAP provides the documented production-approval stage before serial production.

Measurement & process control

Validation connects to ongoing control.

Measurement and process-control methods support documented validation and the stability of serial production according to project requirements.

Testing & Measurement
01

SPC

Applied according to project requirements to monitor defined process parameters.

02

MSA

Supports confirmation of measurement-system capability and repeatability.

03

In-house quality control and testing

Quality-control activity is connected directly with validation and serial production.

From approval to serial production

Approval is a production transition, not the end of control.

01Validation
02PPAP / Approval
03Serial Production
04Ongoing Quality Control
From RFQ to Serial Production

Quality planning
starts with the project.