The Die-Casting Project Process

A controlled project route connects technical evaluation with tooling, validation, production approval and ongoing serial supply.

Start with controlled project information.

The drawing, material requirement and available project specifications provide the basis for feasibility and manufacturing review. Missing requirements should be clarified rather than assumed.

A buyer-oriented route.

RFQFeasibilityEngineeringQuotationToolingValidationApprovalSerial production

This sequence reflects the verified RIVIMETAL project route. Individual documentation and approval requirements remain project-specific.

Validation before serial production.

RIVIMETAL publishes APQP and PFMEA for planning and risk review, with PPAP and FAI supporting documented validation and first-article inspection before production approval.

No PPAP level, sample quantity or approval timing is assumed in this guide.

From RFQ to Serial Production → · APQP & PPAP →